SHERPA    
COST-ESTIMATING SOFTWARE FOR
PLACER MINES
Illustration by Judy Patterson @2004
Sherpa for Placer Mines is an engineering-based menu-driven program that uses
production and deposit data supplied by the user to calculate a series of engineering
parameters, which are in turn used by the program to estimate equipment, labor, and
supply costs. The user works through these parameters, changing them as necessary
to tailor the estimate to conditions at a specific location.
Sherpa for Placer Mines incorporates the following features:
The program is designed to handle up to six production segments. These segments
can run sequentially, or they can
partially or completely overlap.
Deposit constituents can be separated into five separate categories, including topsoil
overburden, pay gravel, bedrock,
and tailings. Different machines can be assigned to each
constituent, or each machine can be assigned to two or more
constituents.
Combinations of eight different types of mining machinery can be incorporated into your
estimates, including:
- Backhoes
- Bulldozers
- Crawler Loaders
-
Draglines
- Hydraulic Shovels
-
Rear-Dump Trucks
- Scrapers
- Wheel Loaders
Users may select from a series of pre-designed mineral processing flowsheets or design
their own. Processing machinery
available to the user includes:
- Apron Feeders
- Bendelari Jigs
- Centrifuges
- Conveyors
- Duplex Jigs
- Sluices
- Concentrating Tables
- Vibrating Feeders
- Vibrating Grizzlies
- Vibrating Screens
- Trommel Screens
The software will accommodate either stationary or mobile processing plants.
Used equipment can be incorporated into the analysis by simply specifying the age of the
machine. The program then
adjusts the purchase and operating costs accordingly.
Of course these adjustments can then be overridden by the
evaluator.
All input variables can be changed from one production segment to the next. Items such
as daily production rates, mining
methods, deposit specifications, wages, salaries,
supply prices, equipment types and sizes, and a host of other project
parameters can be
altered as necessary by the user to meet specific needs.
Ancillary processing and facilities considered in the program include:
- Preproduction Stripping
- Camp Facilities
- Project Road Construction
- Power Generation & Transmission
- Mobilization
- Reclamation
- Project Road
- Sanitation Facilities
- Pumping
- Sampling
- Clearing
- Ditch & Pond Excavation
- Shop, Plant, and Office Buildings
- Fencing
- Potable Water
- Worker Dormitories
- Warehouse Storage
- Cooking Facilities
Ancillary project equipment available to the evaluator includes:
- Pumps
-
Generators
- Pick-up Trucks
-
Flatbed Trucks
- Graders
-
Service Vehicles
Results are presented in cash-flow format. Revenues associated with as many as five
commodities can be considered.
Commodity parameters can be adjusted as to:
- Price
-
Ore Grade
- Dilution
-
Waste Grade
- Plant Recovery
-
Refinery Charges
- Refinery Payments
-
Refinery Charges
In addition, gold values can be adjusted for fineness, as well as for jewelry and nugget
premiums.
A user's manual fully explains program operations, utility functions, and the algorithms used
in the program. Also included is
a detailed tutorial example that enables the user to quickly
learn how to use the primary features of the program.
Help screens are available for each entry. These screens explain the type of information
requested by the program and the
way in which Sherpa determines its suggested values.
Help screens also provide the user with alternative data that can be
used to modify Sherpa's suggested values.
Complete project output reports may be sent directly to a printer. In addition, program
output may also be saved to text files.
These files can then be imported into any major
word processing program to further enhance printed output.
Current supply and equipment prices, operator wages, and staff salaries are contained in a
separate database, which is
automatically queried by the program. Cost values in the
database are supplied by Western Mine Engineering, Inc.'s Mining
Cost Service.
All prices, wages, and salaries can be easily altered by the user within the operating
parameters of the
program.
Here's how Sherpa for Placer Mines works:
OUR APPROACH TO ESTIMATING COSTS
Sherpa software estimates costs using a traditional engineering approach.
Users work through a series of screens on which parameters estimated by the software are presented
in a manner similar to the progression used in a traditional engineering-based cost estimate.
All of these screens are accessed from one main menu. Consequently, users are never more than
one step from the menu and cannot lose track of their location within the program. At any time
users may return to any of the previously viewed screens, alter input parameters, and
view the
impact on project costs.
PRODUCTION
To operate the program, the user first enters information regarding production specification
such as the size of the resource, the daily production rate in terms of bank cubic yards, the
number of hours per shift, the number of shifts per day. Deposit parameters (thickness, density,
and swell) for each of the deposit constituents (topsoil, overburden, pay gravel, and bedrock)
are specified, as are the overall dimensions of the resource and surface expressions
such as side slopes and stream gradients.
MINE PLAN
For each deposit constituent, mining machinery is assigned to the tasks of excavating, loading
transporting, placing, and leveling. Milling equipment is also selected from easy-to-use menus,
and a flow sheet is either selected or designed.
DEVELOPMENT
Next, the program suggests preproduction development requirements based upon the
production, deposit, and method specifications provided by the user. In addition to topsoil
stockpile and overburden stripping requirements, parameters for road construction, clearing,
sampling, and diversion ditch and settling pond excavation are also suggested. The program
also suggests supply prices, hourly worker wages, and staff worker salaries. These suggested
values are reviewed by users and adjusted as necessary for their particular site.
EQUIPMENT
The program then suggests all necessary equipment operating parameters. Values for
excavation depths and excavator efficiencies are estimated, along with transport profile
gradients and distances. These values are based upon equipment sizes selected by the user.
Evaluators are encouraged to change any of the suggested values as necessary to emulate
conditions at their site. Specific equipment parameters provided by the program typically
include weight and volume capacities, bucket or bed fill factors, rolling resistances or
efficiencies, and estimated availability.
ENGINEERING
Engineering parameters are suggested next. Items such as the power generation
requirements and pumping needs are estimated, as are fuel and water storage volumes,
sanitation facility sizes, settling pond and diversion ditch volumes, mobilization distances
and project supply weights and frequencies. Building sizes are estimated for a project shop,
mill building, storage warehouse, and office. If workers are housed onsite, the program suggests
the sizes for dormitories and a cook house estimates daily food and sundry requirements.
These last few values are based upon daily manpower requirements estimated by the
program. All these variables are displayed for the user and are easily altered to reflect
conditions at a specific operation.
COSTS
After the engineering parameters have been defined, project costs are estimated and
displayed. Operating costs are tabulated on both a daily and per-cubic-yard-resource basis
and are then broken down with respect to supplies, hourly laborers, salaried workers, and
capital costs associated with purchasing the equipment and facilities, mobilization,
preproduction development, and constructing the surface facilities and the processing plant.
Values for working capital, engineering and project management fees, and a contingency fund
are also provided, as are the projected equipment salvage values upon project completion and
reclamation costs.
CASH FLOW
Finally, revenues from the recovered commodities are compared to project costs on an annual
basis. All the production segments are accounted for and included in the resulting spreadsheet,
which provides a pre-tax, undiscovered project cash-flow sum.
DEVELOPED BY: AVENTURINE ENGINEERING, INC.
IN CONJUNCTION WITH THE BUREAU OF LAND MANAGEMENT, ALASKA, AND WESTERN MINE
ENGINEERING, INC.
Click
Here to Return to the Homepage
Proceed to Ordering Information